top of page
pexels-terry-magallanes-2988865-scaled.jpeg

Projects

OUR PROJECTS

Koehler St, Gloucester City

Updated: Oct 12, 2023

A full interior gut to the studs. All new layout, utilities, finishes and everything in between. This house was built in the early 1900’s and still has knob and tube wiring in many places. Having everything demoed to the studs allowed us to redesign the layout of the house, adding an additional bedroom and enlarging the bathroom. The end product produced a classic modern design.























77 views0 comments

Recent Posts

See All
bottom of page